FRONT SHEET With he analysis and results from the previous stages , this term provided the platform to develop  the  concept of  “KNOTS”  into an architectural element or a building system which abide the rules of the study. The knots implemented to the existing facade system can either be a factor to decide the internal floor pattern or vice versa.   FORMULZING KNOTS : Methodology  1: 02

  Methodology  2: 03   The knots thus formed had an issue of intersection within the two pipes in a perpendicular fashion which is against the whole concept of the research. Hence  it was provided with a methodology of making new knots in the place where is a n intersection. 04   PROPOSAL : Adapting  “KNOTS” on a facade was a direct architectural implication, which provided the idea of  rethinking facades . 05   The building has an external vertical and horizontal pipe system, which forms the facade. Its about 83 mts high and has 22 floors. 06 07     Strategy  1: 27 08 30     Strategy  2: 32     09 35     Strategy  3: 37 38   Strategy  4: 40 41 Axonometric views : 10